The NYC Ferry is planning its first major route map overhaul since its inception in 2017. The proposed 2025 NYC Ferry Network Optimization Plan aims to enhance rider experience by adding new routes, including a Staten Island-Brooklyn connection. The initiative seeks to improve commute times, increase seat availability, and operate more efficiently while reducing the subsidy per rider. Key proposals include separating the East River into two distinct routes and combining the Soundview and Rockaway routes. Public feedback is being gathered through meetings and an online form until September 1.
The proposed 2025 NYC Ferry Network Optimization Plan will introduce new routes, including a connection between Staten Island and Brooklyn, improving rider access.
This major overhaul aims to enhance commute efficiency, offer more available seats, lessen the subsidy per rider, and better address system-level issues.
Key changes include splitting the East River route into two and merging the Soundview and Rockaway routes to optimize the network.
Public feedback is encouraged for the proposed changes through a meeting and an online submission form available until September 1.
Collection
[
|
...
]