#communications-based-train-control

[ follow ]
fromianVisits
4 days ago

London Underground's 4LM signalling upgrade reaches Neasden depot

The Four Lines Modernisation (4LM) is replacing decades-old signalling along the sub-surface lines with a Communications-Based Train Control (CBTC) system, allowing trains to run closer together.
London music
[ Load more ]