The tunnel boring machines have completed 8.4 miles of tunnels, halfway through the 16.8-mile total length, making it the second longest tunnel on the new railway after the one under the Chiltern Hills.
The four TBMs are named Sushila, Caroline, Emily, and Anne, each working on excavating designated lengths of the tunnel, backed by continuous operations underground and on the surface.
Collection
[
|
...
]