Part of the London Overground will be shut for 16 days from this weekend
Briefly

There will be no Overground from Chingford to Hackney for 16 days from July 20 to August 4. Engineers will demolish the old bridge to build a new one, carrying out vital repairs to a 150-year-old bridge near Hackney Downs park.
Engineers will work on overhead lines, points, drainage systems, and the condition of the ballast under the tracks during the closure. Rail replacement buses will run every 20 minutes between Hackney Downs and Chingford.
Read at Time Out London
[
|
]