The delivery follows an initial batch of 10 buses introduced in August 2025, bringing the total number of vehicles supplied under the programme to 100. The buses have been integrated into the NTC fleet, which has historically operated an ageing vehicle base.
A 47-year-old male driver entered the restricted area of the cable car turnaround and caused damage to the turnaround signal and a protective concrete barrier, but no injuries were reported.
Being named to the Washington State DES contract is a significant milestone for ENC and a testament to the strength of our product portfolio. This contract gives transit agencies across the region a streamlined path to American-made, Altoona-tested heavy-duty buses in every major propulsion category.
John Goodwin, the communications director for the Metropolitan Transportation Commission, stated that the West span path part of the project is 'effectively paused' in the early planning stage, with the soonest work advancing in 2027.
The Central Avenue project is expected to improve safety for all street users and to reduce vehicle delays. The project includes a road diet with two motor vehicle travel lanes, a two-way left-turn lane as a center lane, bikeways, three roundabouts, resurfacing, improved bus stops, enhanced pedestrian crossings and street trees/raingardens.
The San Diego Metropolitan Transit System faces a roughly $500 million funding gap over the next four years, but it's not due to diminishing services. Regional riders are enthusiastic about the transit system - it has one of the fastest growing riderships in the country and ranks third for the number of passenger trips and passenger miles in California. However, like other major transit agencies such as BART, the MTS kept things moving after the pandemic through one-time emergency funds from federal and state subsidies.
"Caltrain and BART would very likely be looking at shutting down passenger service," Deputy Director of Policy Development Melissa Jones said. "In that case, the agencies would be focused on maintenance, trying to secure our assets, keep everything safe while we regroup for the future."
The Clipper system serves BART, AC Transit, and 22 other Bay Area transit systems, with more than 1.2 million cards in use in December 2025, the last month for which Clipper data is available. Since the Clipper Card upgrade rolled out on December 10, users have been venting to The Oaklandside. Some people have said they've been unable to access the digital cash balance they had before the upgrade; others have said their cards became inoperable or they had difficulty adding money to them.
The doomsday plan includes closing the 10 stations with the lowest ridership. That means closing 20% of its stations, impacting 12% of riders. They include Oakland International Airport, South San Francisco and West Dublin/Pleasanton. "It's a tragedy," said Ed Locker, a BART Rider from Santa Rosa. "Everybody uses BART and has for over 50 years, I think. It would be a real sad thing."