fromTheregister
3 months agoDatacenter lifecycle study aims to increase sustainability
Constructing datacenters accounts for 39 percent of their total carbon dioxide emissions, almost as much as operating them, according to an environmental analysis covering the entire lifecycle of a facility. The finding comes from a white paper published by European datacenter operator Data4, which conducted a lifecycle assessment (LCA) of one of its own facilities with the assistance of design and engineering consultants APL Data Center.
Environment