East Austin's 'wishbone' bridge takes shape as concrete beams almost span Lady Bird Lake - Austin Monitor
Briefly

The article discusses the construction of Austin's first "wishbone bridge," which aims to enhance pedestrian safety by connecting the Ann and Roy Butler Hike and Bike Trail at Lady Bird Lake. Once completed in 2026, this structure will eliminate the need for pedestrians to walk alongside traffic on Pleasant Valley Road. It will feature a central plaza with seating and art installations. Additionally, a new, wider pedestrian tunnel beneath Pleasant Valley will provide safer passage. Community members express enthusiasm for increased foot traffic and safety improvements in the area.
"I'm quite excited about (the wishbone bridge), because I think it's going to increase the people on this side of the trail. This side gets a little less foot traffic than the Auditorium Shores/MoPac loop."
"The plaza will have shade, plants and 31 art benches, which can be named after someone for a donation of at least $15,000 to the Trail Conservancy."
Read at Austin Monitor
[
|
]